WI/DOT: I-94 West Leg Segment
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
I-94 West Leg Package. 1060-27-71; 70th Street to Zablocki Drive. Project includes ATC Corridor; Hawley reduced to half interchange; Hawley Pond; Cemetery segment; Interim connection to Stadium segment.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Stadium, Road
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WI/DOT: I-94 West Leg Segment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I-94 West Leg Package. 1060-27-71; 70th Street to Zablocki Drive. Project includes ATC Corridor; Hawley reduced to half interchange; Hawley Pond; Cemetery segment; Interim connection to Stadium segment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Stadium, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
