logo

WI/DOT: IH 041 Road Resurfacing

Sector: Cement • Location: Milwaukee, Wisconsin, United States of America

Source: Dodge USA

Project
Closed

1100-20-70 WISC 2025004 IH 41 Zoo Freeway, Burleigh St to Capitol Dr, IH 041 Milwaukee County 1100-20-71 WISC 2025005 IH 41 Zoo Freeway, Capitol Dr to Silver Spring Dr, IH 041 Milwaukee County - Grading, Base, Concrete Pavement, Asphalt Pavement, Bridge Widening, Bridge Overlays, Sign Bridges, Noise Barrier Wall, Curb and Gutter, Concrete Barrier, Guardrail, Storm Sewer, Fencing, Signs, Pavement M

Status
Closed
Sector
Cement, Car parking, Road, Government, Water Supply and Storage, Bridge, Waste Processing and Treatment, Automotive, Commercial
Location
Milwaukee, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WI/DOT: IH 041 Road Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WI/DOT: IH 041 Road Resurfacing” is an infrastructure initiative in the Cement sector, located in Milwaukee, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1100-20-70 WISC 2025004 IH 41 Zoo Freeway, Burleigh St to Capitol Dr, IH 041 Milwaukee County 1100-20-71 WISC 2025005 IH 41 Zoo Freeway, Capitol Dr to Silver Spring Dr, IH 041 Milwaukee County - Grading, Base, Concrete Pavement, Asphalt Pavement, Bridge Widening, Bridge Overlays, Sign Bridges, Noise Barrier Wall, Curb and Gutter, Concrete Barrier, Guardrail, Storm Sewer, Fencing, Signs, Pavement Markings, Street Lighting, Traffic Signals.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Milwaukee

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Car parking, Road, Government, Water Supply and Storage, Bridge, Waste Processing and Treatment, Automotive, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project