logo
ProjectClosed

WI/DOT: IH 39 Roadway Resurfacing Improvements

Closed · Wisconsin · Last reported Jun 2025

Source: Dodge

1166-01-84 WISC 2025008 Stevens Point Wausau, Business 51 to Foxglove Road, IH 039 Marathon County 1166-05-81 WISC 2025009 Stevens Point Wausau, Bull Junior Creek to Business 51, IH 039 Marathon County 1166-05-85 WISC 2025010 Stevens Point Wausau, STH 34 to Bull Junior Creek, Sb, IH 039 Marathon County Work Summary: Grading, Base, Milling, Asphalt Pavement, Culvert Pipe, Curb and Gutter, Sidewalk,

Status
Closed
Sector
Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
Location
Wausau, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WI/DOT: IH 39 Roadway Resurfacing Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WI/DOT: IH 39 Roadway Resurfacing Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Wausau, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1166-01-84 WISC 2025008 Stevens Point Wausau, Business 51 to Foxglove Road, IH 039 Marathon County 1166-05-81 WISC 2025009 Stevens Point Wausau, Bull Junior Creek to Business 51, IH 039 Marathon County 1166-05-85 WISC 2025010 Stevens Point Wausau, STH 34 to Bull Junior Creek, Sb, IH 039 Marathon County Work Summary: Grading, Base, Milling, Asphalt Pavement, Culvert Pipe, Curb and Gutter, Sidewalk, Storm Sewer, Guardrail, Signs, Pavement Markings.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Wausau

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project