WI/DOT: IH 43 ROCK FREEWAY
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge
Consultant for the pavement needs to be replaced and structures need treatment to extend their service lives. Consultant to replace the pavement of approximately 5.6 miles on IH 43 from STH 20 to STH 83 in Walworth and Waukesha counties. Work includes replacing the pavement along IH 43 including the on and off ramps.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: IH 43 ROCK FREEWAY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consultant for the pavement needs to be replaced and structures need treatment to extend their service lives. Consultant to replace the pavement of approximately 5.6 miles on IH 43 from STH 20 to STH 83 in Walworth and Waukesha counties. Work includes replacing the pavement along IH 43 including the on and off ramps. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
