WI/DOT: Perpetuation Pavement Replacement USH 12
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Perpetuation project to replace the pavement of approximately 1.85 miles of USH 12 from 0.08 miles west of Grain Avenue to Grant Avenue in the City of Tomah in Monroe County. Consultant services for Perpetuation project to replace the pavement of approximately 1.85 miles of USH 12 fom 0.08 miles west of Grain Avenue to Grant Avenue in the City of Tomah in Monroe County. Anticipated to replace the
- Status
- Closed
- Sector
- Consumer Products, Road, Manufacturing (Industrial), Commercial
- Location
- Tomah, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: Perpetuation Pavement Replacement USH 12
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Perpetuation project to replace the pavement of approximately 1.85 miles of USH 12 from 0.08 miles west of Grain Avenue to Grant Avenue in the City of Tomah in Monroe County. Consultant services for Perpetuation project to replace the pavement of approximately 1.85 miles of USH 12 fom 0.08 miles west of Grain Avenue to Grant Avenue in the City of Tomah in Monroe County. Anticipated to replace the pavement current with asphalt. Additional work includes two curb ramp replacements at Grain Avenu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Tomah |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
