logo
ProjectPlanning Schematics

WI/DOT: Pickel Road Bridge Replacement

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

TOWN OF IRONTON, PICKEL ROAD BR NARROWS CREEK BRIDGE B-56-0253 CONST OPS/BRIDGE REPLACEMENT SAUK

Status
Prospective
Sector
Bridge, Road, Commercial
Location
Baraboo, Wisconsin, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WI/DOT: Pickel Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WI/DOT: Pickel Road Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Baraboo, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

TOWN OF IRONTON, PICKEL ROAD BR NARROWS CREEK BRIDGE B-56-0253 CONST OPS/BRIDGE REPLACEMENT SAUK

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Baraboo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project