WI/DOT: STH 156 Road Resurfacing
Closed · Wisconsin · Last reported Sep 2025
Source: Dodge
The work under this contract shall consist of removing asphaltic surface milling, HMA pavement, asphaltic surface patching, culvert replacements and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Bowler, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: STH 156 Road Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under this contract shall consist of removing asphaltic surface milling, HMA pavement, asphaltic surface patching, culvert replacements and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Bowler |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
