WI/DOT: STH 172 Mill & Overlay Improvements (CO 021)
Sector: Water Supply and Storage • Location: Green Bay, Wisconsin, United States of America
Source: Dodge USA
IH 41 - IH 43; Oneida - Green Bay, Airport Entrance - IH 41; Brown County; 1210-09-71, WISC 2023 102; 1210-11-71, WISC 2023 103; STH 172; 8.094 Miles; Grading, Base, Milling, Concrete Pavement, Asphalt Pavement, Culvert Pipe, Storm Sewer, Bridge Deck Repair, Wingwall Repair, Curb and Gutter, Sidewalk, Guardrail, Signs, Sign Structures, and Pavement Markings. Estimate of Principal Items: Excavation
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Commercial, Manufacturing (Industrial)
- Location
- Green Bay, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WI/DOT: STH 172 Mill & Overlay Improvements (CO 021)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | IH 41 - IH 43; Oneida - Green Bay, Airport Entrance - IH 41; Brown County; 1210-09-71, WISC 2023 102; 1210-11-71, WISC 2023 103; STH 172; 8.094 Miles; Grading, Base, Milling, Concrete Pavement, Asphalt Pavement, Culvert Pipe, Storm Sewer, Bridge Deck Repair, Wingwall Repair, Curb and Gutter, Sidewalk, Guardrail, Signs, Sign Structures, and Pavement Markings. Estimate of Principal Items: Excavation Common, 4,577 CY; Backfill Structure, 225 Ton; Base Aggregate Dense, 17,732 Ton; Select Crushed ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Green Bay |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
