logo
ProjectClosed

WI/DOT: STH 27 Bridge Replacement

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

STH 27 - Millston; Clear Creek Bridge B-27-0179 Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Curb and Gutter, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Restoration

Status
Closed
Sector
Mass Transit, Rail, Bridge, Commercial, Road
Location
Black River Falls, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WI/DOT: STH 27 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WI/DOT: STH 27 Bridge Replacement” is an infrastructure initiative in the Mass Transit sector, located in Black River Falls, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

STH 27 - Millston; Clear Creek Bridge B-27-0179 Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Curb and Gutter, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Restoration

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Black River Falls

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Bridge, Commercial, Road

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project