WI/DOT: WIS 16 Pavement Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans to replace the pavement on WIS 16 from East Main Street to just 0.23 miles east of the intersection of WIS 16 and Rock River Road west of Ocon om owoc (8.85 miles). This includes the WIS 16/WIS 19 ramps from East Gate Drive to WIS 16.
- Status
- Prospective
- Sector
- Mass Transit, Road, Bridge, Rail, Commercial
- Location
- Madison, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: WIS 16 Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans to replace the pavement on WIS 16 from East Main Street to just 0.23 miles east of the intersection of WIS 16 and Rock River Road west of Ocon om owoc (8.85 miles). This includes the WIS 16/WIS 19 ramps from East Gate Drive to WIS 16. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Bridge, Rail, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
