WI/DOT: Wolf River Bridge Replacement
Bidding · Wisconsin · Last reported Nov 2026
Source: Dodge
Bridge, Highway Signs/Guardrails, Paving. Bids to Owner Public - State December 08 at 11:00 AM (CST)
- Status
- Prospective
- Sector
- Bridge, Chemical (Industrial), Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Mass Transit, Rail, Manufacturing (Industrial), Warehouse, Cement, Road, Power Generation (CCGT), Telecommunications
- Location
- Wilson, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: Wolf River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Bridge, Highway Signs/Guardrails, Paving. Bids to Owner Public - State December 08 at 11:00 AM (CST) |
Original sector | Transport |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wilson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Bridge, Chemical (Industrial), Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Mass Transit, Rail, Manufacturing (Industrial), Warehouse, Cement, Road, Power Generation (CCGT), Telecommunications |
Article published date | 2026-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
