Width Pav't Resurfacing
Closed · Illinois · Last reported Mar 2024
Source: Dodge USA
CONST. VARIABLE WIDTH PAV'T RESURFACING W/ HOT-MIX ASPH. SURF. CSE., MIX "D", N50 (2,055 TON); INCL. 665 TON HOT-MIX ASPH. BINDER CSE., IL-19.0, N50; 20,160 SQ .YD. HOT-MIX ASPH. SURF. REM. (VAR. TYPES); 5,176 FT. LONG. JOINT SEALANT; 1,491 FT. COMB. CONC. CURB & GUTTER REM. & REPL; 1 L. SUM TRAFFIC CONTROL AND PROTECTION, STD. 701501, ETC. (0.98 MI.)
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- Cary, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Width Pav't Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CONST. VARIABLE WIDTH PAV'T RESURFACING W/ HOT-MIX ASPH. SURF. CSE., MIX "D", N50 (2,055 TON); INCL. 665 TON HOT-MIX ASPH. BINDER CSE., IL-19.0, N50; 20,160 SQ .YD. HOT-MIX ASPH. SURF. REM. (VAR. TYPES); 5,176 FT. LONG. JOINT SEALANT; 1,491 FT. COMB. CONC. CURB & GUTTER REM. & REPL; 1 L. SUM TRAFFIC CONTROL AND PROTECTION, STD. 701501, ETC. (0.98 MI.) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Cary |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
