Wiggins Mill Water Treatment Plant Electric Upgrades
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge
The Wiggins Mill Water Treatment Plant (WTP) Electric Upgrades includes conversion of the existing 2400 volt medium voltage system to 480 volt main switchgear, replacement of the existing 2400 volt motors for the high service pumps and filter backwash pumps with 480 volt motors, the addition of variable frequency drives for the high service pumps, new standby generators, a new electrical building,
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial
- Location
- Wilson, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wiggins Mill Water Treatment Plant Electric Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wiggins Mill Water Treatment Plant (WTP) Electric Upgrades includes conversion of the existing 2400 volt medium voltage system to 480 volt main switchgear, replacement of the existing 2400 volt motors for the high service pumps and filter backwash pumps with 480 volt motors, the addition of variable frequency drives for the high service pumps, new standby generators, a new electrical building, and civil site improvements, as shown on the contract drawings and described in specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
