Wilbarger Wastewater Interceptor
Sector: Water Supply and Storage • Location: Pflugerville, Texas, United States of America
Source: Dodge USA
constructing the Wilbarger Creek Wastewater Interceptor, beginning at the Carmel Lift Station in east Pflugerville and ending at the Future Wilbarger Creek Regional Wastewater Treatment Facility. The scope includes the installation of approximately 3,072 Linear Feet of 48 FRP Pipe, 9,427 Linear Feet of 54 FRP Pipe, various lengths of 18 to 36 sewer pipe installation, and Polymer Concrete Manholes
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | constructing the Wilbarger Creek Wastewater Interceptor, beginning at the Carmel Lift Station in east Pflugerville and ending at the Future Wilbarger Creek Regional Wastewater Treatment Facility. The scope includes the installation of approximately 3,072 Linear Feet of 48 FRP Pipe, 9,427 Linear Feet of 54 FRP Pipe, various lengths of 18 to 36 sewer pipe installation, and Polymer Concrete Manholes and a Diversion Structure with SCADA controls. The project includes open cut and trenchless insta... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
