Wildfire BESS Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Manila Times
A 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas, selected by Frontier Power USA from Bimergen Energy. The project is expected to utilize Eos Energy Enterprises' Z3 long-duration batteries and is part of FPUSA's strategic framework to convert late-stage development opportunities into construction-ready assets.
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- The Manila Times
ConstructChat
Ask ConstructChat about Wildfire BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | selected |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas, selected by Frontier Power USA from Bimergen Energy. The project is expected to utilize Eos Energy Enterprises' Z3 long-duration batteries and is part of FPUSA's strategic framework to convert late-stage development opportunities into construction-ready assets. |
Original sector | Energy Storage |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | The Manila Times |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
