Wildfire BESS Project
Selected · Texas · Last reported Jul 2026
Source: Energy Digital
The Wildfire BESS Project is a 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas. It is selected by Frontier Power USA for conversion onto their platform, expected to utilize Eos Energy Enterprises' Z3 long-duration batteries. The project is part of FPUSA's strategy to convert late-stage development opportunities into construction-ready assets, with closing continge
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Energy Digital
ConstructChat
Ask ConstructChat about Wildfire BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | selected |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wildfire BESS Project is a 100 MW / 400 MWh battery energy storage project located in Caldwell County, Texas. It is selected by Frontier Power USA for conversion onto their platform, expected to utilize Eos Energy Enterprises' Z3 long-duration batteries. The project is part of FPUSA's strategy to convert late-stage development opportunities into construction-ready assets, with closing contingent on definitive documentation and Eos's rights offering. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Energy Digital |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
