Wildfire Command Centre Renovation
Closed · Alberta · Last reported Oct 2021
Source: Dodge USA
Coordinate final power requirement with mechanical contractor. .3 Provide power to all equipment listed on schedule or otherwise shown on drawings. .4 Provide all motor starters as and where indicated. .5 Provide all line disconnects on the line side of all power connections. .6 Install, wire and connect all electric heaters indicated on heater schedule or otherwise noted on drawings. Install, wir
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Residential, Road, Manufacturing (Industrial)
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wildfire Command Centre Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Coordinate final power requirement with mechanical contractor. .3 Provide power to all equipment listed on schedule or otherwise shown on drawings. .4 Provide all motor starters as and where indicated. .5 Provide all line disconnects on the line side of all power connections. .6 Install, wire and connect all electric heaters indicated on heater schedule or otherwise noted on drawings. Install, wire and connect all electric heating control. .7 Control wiring to be done as follows unless noted ... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Residential, Road, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
