Wiley W Manuel Courthouse UST Removal & AST Install
Sector: Consumer Products • Location: Oakland, California, United States of America
Source: Dodge
The Project consists of: Removal of two existing 10,000-gallon underground storage tanks (USTs), construction of an aboveground storage tank (AST) enclosure, and installation of one 12,000-gallon AST. The Work of this Contract may consist of the following: (1) Reuse, recycle, or dispose of remaining diesel product in underground storage tanks (USTs) and piping. Reuse, recycle or disposal of diesel
- Status
- Prospective
- Sector
- Consumer Products, Raw Materials, Government, Commercial
- Location
- Oakland, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wiley W Manuel Courthouse UST Removal & AST Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of: Removal of two existing 10,000-gallon underground storage tanks (USTs), construction of an aboveground storage tank (AST) enclosure, and installation of one 12,000-gallon AST. The Work of this Contract may consist of the following: (1) Reuse, recycle, or dispose of remaining diesel product in underground storage tanks (USTs) and piping. Reuse, recycle or disposal of diesel product must comply with all applicable federal, state, and local regulations. (2) Remove and di... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Raw Materials, Government, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
