Willamette River Stormwater Improvement Project
The status, timeline and source of this project. A free account opens every field.
We are improving our environmental impact by building stormwater treatment facilities to clean stormwater runoff from the Fremont Bridge (I-405), the St Johns Bridge (U.S. 30 BY) and U.S. 30 in NW Portland. These systems connect into our current stormwater pipes removing large debris like trash and smaller pollutants like metals and oil from the water.
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Bridge, Oil and Gas, Government, Commercial
- Location
- United States of America
- Updated
- 19 Nov 2026
- Source
- oregon_state
ConstructChat
Ask ConstructChat about Willamette River Stormwater Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | We are improving our environmental impact by building stormwater treatment facilities to clean stormwater runoff from the Fremont Bridge (I-405), the St Johns Bridge (U.S. 30 BY) and U.S. 30 in NW Portland. These systems connect into our current stormwater pipes removing large debris like trash and smaller pollutants like metals and oil from the water. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
Source
Source | oregon_state |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Bridge, Oil and Gas, Government, Commercial |
Article published date | 2026-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
