William Annin MS Roadway & Parking Lot Improvements
Sector: Commercial • Location: Basking Ridge, New Jersey, United States of America
Source: Dodge USA
The project generally consists of the reconstruction of the William Annin Middle School asphalt driveway, along with the resurfacing of the asphalt driveway entrance from Quincy Road as well as areas of the parking lot to the east of the building. The improvements include excavation, milling and the overlaying of the roadway and parking lot with hot mix asphalt 9.5 M64 surface course, removal and
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Manufacturing (Industrial)
- Location
- Basking Ridge, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about William Annin MS Roadway & Parking Lot Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of the reconstruction of the William Annin Middle School asphalt driveway, along with the resurfacing of the asphalt driveway entrance from Quincy Road as well as areas of the parking lot to the east of the building. The improvements include excavation, milling and the overlaying of the roadway and parking lot with hot mix asphalt 9.5 M64 surface course, removal and replacement of concrete curb and sidewalk, traffic striping, and the reconstruction of inlets and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Basking Ridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
