Williamson Drain #556
Sector: Water Supply and Storage • Location: Berrien Springs, Michigan, United States of America
Source: Dodge USA
Installation of 1 culvert of approximately 80 feet length utilizing 48" RCP with an average depth of 6 feet. Installation of 3 culverts of approximately 100 feet length utilizing 18" H.D.P.E. Dual Wall with an average depth of 3 feet. Installation of 2 culverts of approximately 100 feet length utilizing 24" RCP with an average depth of 3 feet. Installation of approximately 231 feet of 12" H.D.P.E.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Installation of 1 culvert of approximately 80 feet length utilizing 48" RCP with an average depth of 6 feet. Installation of 3 culverts of approximately 100 feet length utilizing 18" H.D.P.E. Dual Wall with an average depth of 3 feet. Installation of 2 culverts of approximately 100 feet length utilizing 24" RCP with an average depth of 3 feet. Installation of approximately 231 feet of 12" H.D.P.E. Dual Wall, approximately 2,367 feet of 48" H.D.P.E. Dual Wall, approximately 70 feet of 18" R.C.... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
