logo

Williamson Translational Research Building, Geisel School of Medicine

Sector: Bridge • Location: United States

Source: Pharmaceutical Technology

Project
Closed

Construction of the Williamson Translational Research Building (WTRB) at the Geisel School of Medicine began in June 2013 and was completed in August 2015. Translational research building Dartmouth Hitchcock Medical Centre, Lebanon, New Hampshire June 2013 August 2015 $116.5m HDR Casali Group, ORW, RG Gosselin, Simpson Gumpertz and Heger (SGH) Construction of the Williamson Translational Research

Project Information FAQ

Project Information

5 Q
The project “Williamson Translational Research Building, Geisel School of Medicine” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of the Williamson Translational Research Building (WTRB) at the Geisel School of Medicine began in June 2013 and was completed in August 2015. Translational research building Dartmouth Hitchcock Medical Centre, Lebanon, New Hampshire June 2013 August 2015 $116.5m HDR Casali Group, ORW, RG Gosselin, Simpson Gumpertz and Heger (SGH) Construction of the Williamson Translational Research Building (WTRB) at the Geisel School of Medicine began in June 2013 and was completed in August 2015. WTRB is located within the Dartmouth-Hitchcock Medical Centre (DHMC) campus in Lebanon, New Hampshire. It is named after neurologists Peter and Susan Williamson. The building is equipped with research facilities to support the collaboration of biomedical scientists and clinicians to accelerate the advancement of discoveries from research labs into patient care. The translational research facility is located in a six-storey building with a 166,000ft² total floor space. It includes 39 wet laboratories, a pathology lab, a vivarium, a 200-seat auditorium, huddle rooms and office spaces. The facility accommodates interdisciplinary teams of bench scientists, physician-researchers, healthcare delivery researchers and biomedical data scientists from the Dartmouth Institute for Health Policy and Clinical Practice. The building is clad with metal panels and glass curtain walls. It has a large atrium and bridges connecting the WTRB to the main hall of DHMC, as well as to the surrounding Borwell and Rubin buildings. Dartmouth’s Board of Trustees gave approval for the construction of the WTRB in June 2012, with construction work beginning in June 2013. The construction of a glass corridor auditoria E, F and G, and a hall connecting the WTRB with the main Medical Centre began in April 2014. The design of the WTRB was provided by Nebraska-based design firm HDR. Project management company Casali Group was contracted to provide project management services. ORW was contracted to provide landscaping design services, including the integration of native plant materials and a landscaped rain garden. Boston-based engineering firm Simpson Gumpertz and Heger (SGH) was contracted for engineering services for the structures and building enclosures. Concrete and excavating contractor RG Gosselin was contracted to supply concrete and provide excavation services. A $116.5m investment was made for building the WTRB. This investment was funded through a $20m donation by Peter and Susan Williamson to the Transforming Medicine Campaign in 2007. DHMC contributed $20m for the project, while an additional $18m grant was awarded by the Geisel School of Medicine under the National Institutes of Health’s Clinical and Translational Science Award programme in October 2013. The WTRB was designed with the aim of receiving Leadership in Energy and Environmental Design (LEED) silver certification. The facility was awarded LEED silver certification by the US Green Building Council in 2016. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data