Willmar Street Improvement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work includes the construction of approximately: 10100 SQ YD FULL DEPTH RECLAMATION (8") 2000 CU YD SALVAGE HAUL STOCKPILE RECLAIM 1965 CU YD COMMON EXCAVATION 2500 TON BITUMINOUS SURFACING 1650 LIN FT CONCRETE CURB & GUTTER B624 8750 SQ FT 4"-6" CONCRETE WALK 175 SQ FT TRUNCATED DOMES 35 EACH REMOVE AND REPLACE CASTING 24 LIN FT REMOVE AND REPLACE STORM STRUCTURE 65 EACH STORM DRAIN INLET PRO
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Commercial, Cement, Government, Waste Processing and Treatment
- Location
- Willmar, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Willmar Street Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the construction of approximately: 10100 SQ YD FULL DEPTH RECLAMATION (8") 2000 CU YD SALVAGE HAUL STOCKPILE RECLAIM 1965 CU YD COMMON EXCAVATION 2500 TON BITUMINOUS SURFACING 1650 LIN FT CONCRETE CURB & GUTTER B624 8750 SQ FT 4"-6" CONCRETE WALK 175 SQ FT TRUNCATED DOMES 35 EACH REMOVE AND REPLACE CASTING 24 LIN FT REMOVE AND REPLACE STORM STRUCTURE 65 EACH STORM DRAIN INLET PROTECTION 1600 SQ YD TURF ESTABLISHMENT together with numerous related items of work, all in accord... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Willmar |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial, Cement, Government, Waste Processing and Treatment |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
