Willow Creek Dam Rehabilitation
Sector: Commercial • Location: Fairfield, Montana, United States of America
Source: Dodge
The DNRC is seeking SOQs from engineering firms to perform engineering design and construction management for rehabilitation of the Willow Creek Dam. The work will consist of reviewing the feasibility study completed by HDR for technical adequacy and recommended design components, preparing final design and construction documents, and providing construction management services. The goal of the reh
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Hydro, Water Supply and Storage
- Location
- Fairfield, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Willow Creek Dam Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The DNRC is seeking SOQs from engineering firms to perform engineering design and construction management for rehabilitation of the Willow Creek Dam. The work will consist of reviewing the feasibility study completed by HDR for technical adequacy and recommended design components, preparing final design and construction documents, and providing construction management services. The goal of the rehabilitation is to increase dam safety and regional drought resilience by rehabilitating the dam a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Fairfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Hydro, Water Supply and Storage |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
