Willow Creek Floodplain Improvements
Sector: Commercial • Location: Heppner, Oregon, United States of America
Source: Dodge USA
Work consists of: The Work for this Contract involves excavating a floodplain throughout the Project Site near Willow Creek. This Work also includes demolition of existing pipes, utility lines, and other infrastructure required for the excavation, together with all other Work required to complete the Project as shown on the Drawings and specifications.
- Status
- Closed
- Sector
- Commercial, Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Heppner, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Willow Creek Floodplain Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of: The Work for this Contract involves excavating a floodplain throughout the Project Site near Willow Creek. This Work also includes demolition of existing pipes, utility lines, and other infrastructure required for the excavation, together with all other Work required to complete the Project as shown on the Drawings and specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Heppner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
