Wind Energy Capacity Expansion in Gujarat and Karnataka
Sector: Solar • Location: Gujarat, Karnataka, India
Source: Mercomindia.com
India added 1.6 GW of wind energy capacity in Q2 2025, marking a 113% year-over-year increase. Gujarat led with 1.14 GW added, including 108 MW commissioned by Adani Green Energy at Khavda and 90 MW commissioned by NTPC under the Solar Energy Corporation of India’s ISTS Wind-Solar Hybrid Projects (Tranche IV). Karnataka added 363.6 MW. The cumulative installed wind capacity in India reached 51.6 G
- Status
- Closed
- Sector
- Solar, Wind
- Location
- Gujarat, Karnataka, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Wind Energy Capacity Expansion in Gujarat and Karnataka
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India added 1.6 GW of wind energy capacity in Q2 2025, marking a 113% year-over-year increase. Gujarat led with 1.14 GW added, including 108 MW commissioned by Adani Green Energy at Khavda and 90 MW commissioned by NTPC under the Solar Energy Corporation of India’s ISTS Wind-Solar Hybrid Projects (Tranche IV). Karnataka added 363.6 MW. The cumulative installed wind capacity in India reached 51.6 GW as of June 2025. |
Original sector | Energy |
Location
Country | India |
State | Gujarat, Karnataka |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
