WIND FARM GULF OF SUEZ
Sector: Wind • Location: Egypt
Source: European Investment Bank (EIB)
The project involves design, construction and commissioning of a large-size 200 MW onshore wind farm to be located on the west bank of the Gulf of Suez, Egypt; some 400 km southeast of Cairo. Depending on the turbine type up to 100 turbines will be installed. The site, of a size of around about 57 km², is characterised by its arid desert conditions and has very favourable wind resources. In addit
- Status
- Prospective
- Sector
- Wind, Raw Materials, Government, Manufacturing (Industrial)
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about WIND FARM GULF OF SUEZ
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves design, construction and commissioning of a large-size 200 MW onshore wind farm to be located on the west bank of the Gulf of Suez, Egypt; some 400 km southeast of Cairo. Depending on the turbine type up to 100 turbines will be installed. The site, of a size of around about 57 km², is characterised by its arid desert conditions and has very favourable wind resources. In addition, a 22/220 kV substation will be constructed. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Government, Manufacturing (Industrial) |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
