Wind Peak Ship Operations
Under construction · England · Last reported May 2025
Source: BBC
The Wind Peak is a purpose-built vessel designed to transport wind turbine components from a Siemens Gamesa plant to the Sofia offshore wind farm in the North Sea. The ship is capable of carrying enough equipment to build six turbines at a time, and the crew lives on board for four weeks at a time before taking leave.
- Status
- Under Construction
- Sector
- Wind, Seaport, Raw Materials, Power Generation (CCGT)
- Location
- Hull, England, United Kingdom
- Updated
- 22 Jul 2026
- Source
- BBC
ConstructChat
Ask ConstructChat about Wind Peak Ship Operations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wind Peak is a purpose-built vessel designed to transport wind turbine components from a Siemens Gamesa plant to the Sofia offshore wind farm in the North Sea. The ship is capable of carrying enough equipment to build six turbines at a time, and the crew lives on board for four weeks at a time before taking leave. |
Original sector | Renewable Energy |
Location
Country | United Kingdom (UK) |
State | England |
City | Hull |
Source
Source | BBC |
URL |
More Details
Record type | Project |
Sector | Wind, Seaport, Raw Materials, Power Generation (CCGT) |
Article published date | 2025-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
