logo
ProjectClosed

Wind River Apartments Phase III

Closed · Oregon · Last reported Jun 2025

Source: Dodge

This project will consist of ten 10 new two-story school multi-family apartment buildings, consisting of 1-bedroom and 2-bedroom units, to be constructed on an open, largely flat site. Construction is conventional wood frame, with crawl space over a structural reinforced concrete stem-wall with reinforced concrete spread footings. The Work will also include excavation, site grading and site utilit

Status
Closed
Sector
Road, Cement, Wind, Power Transmission, Power Generation (CCGT), Government, Commercial, Residential
Location
Hood River, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wind River Apartments Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wind River Apartments Phase III” is an infrastructure initiative in the Road sector, located in Hood River, Oregon, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will consist of ten 10 new two-story school multi-family apartment buildings, consisting of 1-bedroom and 2-bedroom units, to be constructed on an open, largely flat site. Construction is conventional wood frame, with crawl space over a structural reinforced concrete stem-wall with reinforced concrete spread footings. The Work will also include excavation, site grading and site utility connections to existing utility lines in the street. Other site improvements include a new stre...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hood River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Cement, Wind, Power Transmission, Power Generation (CCGT), Government, Commercial, Residential

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project