Wind River Apartments Phase III
Closed · Oregon · Last reported Jun 2025
Source: Dodge
This project will consist of ten 10 new two-story school multi-family apartment buildings, consisting of 1-bedroom and 2-bedroom units, to be constructed on an open, largely flat site. Construction is conventional wood frame, with crawl space over a structural reinforced concrete stem-wall with reinforced concrete spread footings. The Work will also include excavation, site grading and site utilit
- Status
- Closed
- Sector
- Road, Cement, Wind, Power Transmission, Power Generation (CCGT), Government, Commercial, Residential
- Location
- Hood River, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wind River Apartments Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will consist of ten 10 new two-story school multi-family apartment buildings, consisting of 1-bedroom and 2-bedroom units, to be constructed on an open, largely flat site. Construction is conventional wood frame, with crawl space over a structural reinforced concrete stem-wall with reinforced concrete spread footings. The Work will also include excavation, site grading and site utility connections to existing utility lines in the street. Other site improvements include a new stre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hood River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Wind, Power Transmission, Power Generation (CCGT), Government, Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
