logo

Windermere Fire Station No. 31 / gh3* + S2

Sector: Steel

Source: ArchDaily

Project
Closed

The design challenge was to create an expressive and engaging structure that encourages community pride and incorporates technical advances in environmental performance. The City ofEdmontonrequested a highly sustainable project that would generate on-site renewable energy equal to 100% of total building energy needs. The facility must also have an energy performance that is 40% more efficient than

Project Information FAQ

Project Information

3 Q
The project “Windermere Fire Station No. 31 / gh3 + S2” is an infrastructure initiative in the Steel sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The design challenge was to create an expressive and engaging structure that encourages community pride and incorporates technical advances in environmental performance. The City ofEdmontonrequested a highly sustainable project that would generate on-site renewable energy equal to 100% of total building energy needs. The facility must also have an energy performance that is 40% more efficient than NECB 2011, yield 40% better Green House Gas emissions than the baseline using NECB 2011, and operate at 80 kilowatt hours per square meter per year for heating needs.The project site was unbuilt and unremarkable – essentially a blank slate. The station’s form was derived from a desire to underscore both the iconic image of a fire station as a community anchor and a contemporary imperative for sustainable citizenship. A typical fire station might have been characterized by familiar signatures such as a pitched roof, large fire truck doors, a hose and bell tower, and solid and heavy load-bearing walls. Windermere adheres to those features; however, it re-imagines the hose and bell tower form – now redundant elements – with a gently curving, south-facing roof, outfitted with an extensive array of photovoltaic panels.Text description provided by the architects.As civic buildings, fire stations are highly functional and technical facilities, unusually embedded in residential communities for citizen safety. At once practical and symbolic, contemporary fire stations serve a critical public service while conveying important civic values within a neighborhood.This is gh3’s sixth completed project for the City ofEdmonton. It demonstrates a shared commitment to sustainable methods of constructing and operating public buildings and infrastructure and to the creation of a healthier and more sustainable future for its citizens.Inside, the unified mass houses two programmatic elements – an apparatus bay for trucks and equipment, as well as domestic and sleeping spaces for firefighters. The apparatus bay is painted in white color, increasing interior daylight levels and promoting a healthy working environment. The domestic area is organized around a corridor circuit, with the change rooms and fitness center in the middle, and the sleeping areas, kitchen, lounge, and offices around the perimeter.Other strategies to increase environmental performance include the building’s southern orientation -this reduces energy demand by improving the quality of light received in the workplace. A geothermal heating and cooling system is also incorporated. The building is extremely well-insulated and includes high-performance windows and exterior doors. The facility has significantly fewer windows than the average building and uses bi-folding and quick-closing apparatus bay doors to restrict heat loss from typical use. The landscape design similarly strives to balance functional demands with aesthetic rigor - the site is planned around a bioswale stormwater management system that integrates subtly with staff and visitor parking, fire truck entry and exit aprons, and other landscaped areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data