Windfall Underground Mine
Sector: Hydro • Location: Quebec, Canada
Source: The Northern Miner
Gold Fields is preparing to start production at its Windfall underground gold mine in Quebec, acquired through a C$2.2-billion acquisition of Osisko Mining. The project aims to begin production by late 2026 or early 2027 after permitting and approximately 18 months of construction. Windfall is located in the Urban-Barry Greenstone belt, about 700 km north of Montreal in the Eeyou Istchee James Bay
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- The Northern Miner
ConstructChat
Ask ConstructChat about Windfall Underground Mine
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gold Fields is preparing to start production at its Windfall underground gold mine in Quebec, acquired through a C$2.2-billion acquisition of Osisko Mining. The project aims to begin production by late 2026 or early 2027 after permitting and approximately 18 months of construction. Windfall is located in the Urban-Barry Greenstone belt, about 700 km north of Montreal in the Eeyou Istchee James Bay region. The mine is expected to produce 3.2 million ounces of gold over a 10-year life with an average annual output of 306,000 ounces. Initial capital costs are estimated at C$788.6 million with sustaining capital of C$587.6 million. The project is positioned as a tier one asset with a focus on high-quality jurisdictions and environmental sustainability, including hydro power supply. |
Original sector | Mining |
Budget |
Location
Country | Canada |
State | Quebec |
Source
Source | The Northern Miner |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2025-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
