Windham Precast Concrete Box Culvert
Bidding · Vermont · Last reported Jan 2025
Source: Dodge
Work to be performed under this project includes: removal of existing 72 corrugated metal pipe, installation of a new 14-0 W x 7-0 H x 56-0 L precast concrete box culvert with cutoff walls, wingwalls, replacement backfill, guardrail, and other related items
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Metal, Cement, Wind, Waste Processing and Treatment, Commercial
- Location
- West Townshend, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Windham Precast Concrete Box Culvert
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed under this project includes: removal of existing 72 corrugated metal pipe, installation of a new 14-0 W x 7-0 H x 56-0 L precast concrete box culvert with cutoff walls, wingwalls, replacement backfill, guardrail, and other related items |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | West Townshend |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Cement, Wind, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
