Windham Street Water Main Replacement
Closed · Ohio · Last reported Sep 2024
Source: Dodge USA
The Project consists of constructing approximately 3,330 lineal feet of 8-inch water main pipe installed by open excavation, soil staging area, including water main pipe and fittings, valves, and fire hydrants; reconnection of existing water services and abandonment of the existing 8-inch water main and appurtenances along Windham Street.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Wind
- Location
- Garrettsville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Windham Street Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of constructing approximately 3,330 lineal feet of 8-inch water main pipe installed by open excavation, soil staging area, including water main pipe and fittings, valves, and fire hydrants; reconnection of existing water services and abandonment of the existing 8-inch water main and appurtenances along Windham Street. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Garrettsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Wind |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project