Windjammer Shoreline Stabilization
Sector: Car parking • Location: Tega Cay, South Carolina, United States of America
Source: Dodge
Procure necessary materials, equipment, labor, permits, etc. to complete shoreline stabilization at Windjammer Park Shoreline Stabilization would include the use of Rip Rap along 500ft of shoreline with approximately 350 tons of Rip Rap. Area of service pictured below Shoreline stabilization (Rip Rap) shall be installed from Lake Wylie. Access to Windjammer Park will be limited.
- Status
- Closed
- Sector
- Car parking, Commercial, Automotive, Government, Wind, Aerospace & Defense
- Location
- Tega Cay, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Windjammer Shoreline Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Procure necessary materials, equipment, labor, permits, etc. to complete shoreline stabilization at Windjammer Park Shoreline Stabilization would include the use of Rip Rap along 500ft of shoreline with approximately 350 tons of Rip Rap. Area of service pictured below Shoreline stabilization (Rip Rap) shall be installed from Lake Wylie. Access to Windjammer Park will be limited. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Tega Cay |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Government, Wind, Aerospace & Defense |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
