Wine Country Road & Higgins Way Improvements
Closed · Washington · Last reported Jan 2024
Source: Dodge USA
Scope - Construction of sidewalk, water, and sewer along Wine Country Road and Higgins Way including 650 CY unclassified excavation, storm drainage, 500 TON HMA, 1,250 TON crushed surfacing, 2,000 LF curb and gutter, 550 SY sidewalk, 2,000 LF sanitary sewer, 10 manholes, 1,600 LF water main, 4 fire hydrants, illumination system modifications, and other related work. Plans, specifications, and esti
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Grandview, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wine Country Road & Higgins Way Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - Construction of sidewalk, water, and sewer along Wine Country Road and Higgins Way including 650 CY unclassified excavation, storm drainage, 500 TON HMA, 1,250 TON crushed surfacing, 2,000 LF curb and gutter, 550 SY sidewalk, 2,000 LF sanitary sewer, 10 manholes, 1,600 LF water main, 4 fire hydrants, illumination system modifications, and other related work. Plans, specifications, and estimates; construction administration and observation; environmental documentation and permit prepar... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Grandview |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
