logo

Winnebago 2024 New Educare Entrance

Sector: Water Supply and Storage • Location: Winnebago, Nebraska, United States of America

Source: Dodge USA

Project
Closed

Entrance road project to provide approximately 310 LF long 9-inch thick concrete right turn lane (including taper) along Hwy. 75 and roughly 320 LF of 7- to 9-inch thick concrete entrance road and 19 stall 60 degree parking with associated highway crossing, earthwork, curb and gutter, sidewalk and curb ramps, lighting, and storm sewer system which includes a 100 LF extension of a 72" RCP outfall.

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial
Location
Winnebago, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Winnebago 2024 New Educare Entrance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Winnebago 2024 New Educare Entrance” is an infrastructure initiative in the Water Supply and Storage sector, located in Winnebago, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Entrance road project to provide approximately 310 LF long 9-inch thick concrete right turn lane (including taper) along Hwy. 75 and roughly 320 LF of 7- to 9-inch thick concrete entrance road and 19 stall 60 degree parking with associated highway crossing, earthwork, curb and gutter, sidewalk and curb ramps, lighting, and storm sewer system which includes a 100 LF extension of a 72" RCP outfall.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Winnebago

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project