Wireless Communication Facility (WCF)-Express-Building Construction:401/K
The status, timeline and source of this project. A free account opens every field.
Source: City of San Diego Development Permits
SPECTRUM ACT-VERIZON-GASLAMP- DOWNTOWN-Building & Electrical permits modification to an existing wireless facility, modifications include, remove (7) existing panel antennas, install (8) new panel antennas, install (2) new RRUs, upgrade existing DC power plant, install (1) new DC up-converter, remove (1) existing equipment cabinet, install (1) new equipment cabinet, install bird mesh screening at
- Status
- Prospective
- Sector
- Energy Storage, Broadband, Telecommunications, Power Generation (CCGT), Commercial
- Location
- San Diego, United States of America
- Updated
- 19 Nov 2026
- Source
- City of San Diego Development Permits
ConstructChat
Ask ConstructChat about Wireless Communication Facility (WCF)-Express-Building Construction:401/K
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | issued |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SPECTRUM ACT-VERIZON-GASLAMP- DOWNTOWN-Building & Electrical permits modification to an existing wireless facility, modifications include, remove (7) existing panel antennas, install (8) new panel antennas, install (2) new RRUs, upgrade existing DC power plant, install (1) new DC up-converter, remove (1) existing equipment cabinet, install (1) new equipment cabinet, install bird mesh screening at top and bottom of FRP boxes. NOTE- No new batteries are to be added as part of this project. |
Original sector | Add/Alt Tenant Improvements |
Budget |
Location
Country | United States of America (USA) |
City | San Diego |
Source
Source | City of San Diego Development Permits |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Broadband, Telecommunications, Power Generation (CCGT), Commercial |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
