Wireless Communication Facility(WCF)-Discretionary Project:5175/Del Mar Mesa
Open · United States
Source: City of San Diego Development Permits
SCR - 5175 Del Mar Mesa - Verizon Wireless is proposing to modify an existing wireless telecommunications facility at 5175 Del Mar Mesa Road. The existing facility, designed as a prefabricated barn, includes three (3) sectors of panel antennas concealed within a cupola. Associated equipment cabinets are located within a block wall enclosure adjacent to the existing barn. Existing antennas are moun
- Status
- Prospective
- Sector
- Broadband, Telecommunications, Road
- Location
- San Diego, United States of America
- Updated
- 19 Nov 2026
- Source
- City of San Diego Development Permits
ConstructChat
Ask ConstructChat about Wireless Communication Facility(WCF)-Discretionary Project:5175/Del Mar Mesa
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SCR - 5175 Del Mar Mesa - Verizon Wireless is proposing to modify an existing wireless telecommunications facility at 5175 Del Mar Mesa Road. The existing facility, designed as a prefabricated barn, includes three (3) sectors of panel antennas concealed within a cupola. Associated equipment cabinets are located within a block wall enclosure adjacent to the existing barn. Existing antennas are mounted at a tip height of 27’-10” and the proposed tip height of the antennas will remain unchanged. Proposed antennas will be placed in the same location as existing antennas and utilize existing concealment elements. Antennas and associated equipment will be fully concealed within an existing cupola. This facility was originally approved on October 14th, 2009, through Conditional Use Permit No. 681056. The proposed site consists of the following: • Removal of six (6) 4’-0” panel antennas • Installation of three (3) 30.8” panel antennas • Installation of three (3) 8.41” panel antennas w/ integrated remote radio units • Installation of two (2) raycaps (one (1) @ antenna location and one (1) @ existing equipment location) The existing equipment area will remain unchanged with approximately 278 square feet for associated equipment cabinets. |
Location
Country | United States of America (USA) |
City | San Diego |
Source
Source | City of San Diego Development Permits |
URL |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Road |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States
- Pepperidge Farm Bakery Plant
- Bettcher Innovation Centre (BIC), Ohio, US
- New Belgium Brewing Company’s Colorado Facility
- Nova Southeastern University (NSU) Centre for Collaborative Research
- Pfizer European R&D Headquarters, Sandwich, Kent
- Fillmore Water Recycling Programme Project, California
- Sinking Creek Wastewater Treatment Plant Expansion, Tennessee
- Fort Benning, Georgia
