logo

WIRI EMU Depot - Upgrade Graffiti Wash Building

Sector: Commercial • Location: Auckland, New Zealand

Source: Auckland Transport

Project
Closed

​Wash Bay Extension:Provision of a single building capable of fully enclosing one carriage, by providing an extension to the existing structure. Construction will include: A 6 meter extension the current building. High level platforms and access stairs on either side of the extended building for EMU roof cleaning. Additional services connection points A self-draining floor with a soil separa

Project Information FAQ

Project Information

3 Q
The project “WIRI EMU Depot - Upgrade Graffiti Wash Building” is an infrastructure initiative in the Commercial sector, located in Auckland, New Zealand. Taiyo aggregates data on it from Auckland Transport.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

​Wash Bay Extension:Provision of a single building capable of fully enclosing one carriage, by providing an extension to the existing structure. Construction will include: A 6 meter extension the current building. High level platforms and access stairs on either side of the extended building for EMU roof cleaning. Additional services connection points A self-draining floor with a soil separation sump leading to a trade wastewater system. Upgraded electrical systems in the current building Upgraded fire sprinkler system. Post Incident Pit (PIP): This will be provided in a standalone area alongside the existing building. Construction will include: A bio-cleaning pit approximately 30m long for cleaning the undercarriage and bogey of the trains. Steel roof and walls to enclose the pit A self-draining floor with a soil separation sump leading to a trade wastewater system. The sump can be isolated for forensic inspection, prior to discharge to trade waste water system and the drainage system includes a vertical pump to take account level differences. Services connection points Wheel Lathe Canopy: Extension of the canopy on Road 10, at the south end of the depot to prevent rain water from cascading from carriages into the wheel lathe area. Local Board = Manurewa

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data