logo

WIS 22 (WIS 156 to Lake Wagner Road)

Sector: Water Supply and Storage • Location: Waupaca, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

This section of WIS 22 connects smaller communities together. The proposed work on WIS 22 will address the aged and deteriorated pavement and curb and gutter, add pavement marking, modify intersections, and upgrade curb ramps to provide the public a safe facility. Proposed improvements include: 5.5-inch mill and overlay in the city of Clintonville, from the beginning of the project approximately 5

Project Information FAQ

Project Information

4 Q
The project “WIS 22 (WIS 156 to Lake Wagner Road)” is an infrastructure initiative in the Water Supply and Storage sector, located in Waupaca, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This section of WIS 22 connects smaller communities together. The proposed work on WIS 22 will address the aged and deteriorated pavement and curb and gutter, add pavement marking, modify intersections, and upgrade curb ramps to provide the public a safe facility. Proposed improvements include: 5.5-inch mill and overlay in the city of Clintonville, from the beginning of the project approximately 50 feet north of WIS 156 for approximately 0.57 miles.1.5-inch mill, 3-inch cold-in-place recycle and a 2.5-inch overlay of new asphaltic pavement in the rural portions of the project. The rural portions are between Clintonville and Embarrass, as well as north of the Embarrass village limits to the end of the project.Reconstruction through village of Embarrass. 16-inch subgrade, 12-inch base, 5.5-inch new asphaltic pavement, new concrete curb and gutter. The road will be narrowed from its existing width of 44 feet to a width of 32 feet. Curb ramps will be updated to meet current Americans with Disabilities Act (ADA) standards. The village of Embarrass may replace their sanitary sewer and water utilities.To improve safety, reconstruct the intersection of WIS 22 and Main Street in the village of Embarrass. The intersection has experienced some crashes caused by southbound WIS 22 turning right (westbound) to remain on WIS 22. It is proposed to reconstruct the curb and gutter to a new alignment and adjust pavement markings to allow for better traffic flow for larger vehicles through the intersection.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data