logo

WIS 23 (County A to the Fond du Lac County line)

Sector: Water Supply and Storage • Location: Green Lake County, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

The existing pavement on WIS 23 is showing signs of distress in the form of low-level longitudinal and transverse cracking. These cracks may deteriorate further to become safety hazard​s, especially during weather events and contribute to continued accelerated pavement deterioration by allowing water to seep beneath the roadway surface. The purpose of this project is to address the existing roadwa

Project Information FAQ

Project Information

4 Q
The project “WIS 23 (County A to the Fond du Lac County line)” is an infrastructure initiative in the Water Supply and Storage sector, located in Green Lake County, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The existing pavement on WIS 23 is showing signs of distress in the form of low-level longitudinal and transverse cracking. These cracks may deteriorate further to become safety hazard​s, especially during weather events and contribute to continued accelerated pavement deterioration by allowing water to seep beneath the roadway surface. The purpose of this project is to address the existing roadway deficiencies and ensure the preservation of the roadway. The proposed improvements include resurfacing 4.7 miles of WIS 23, between County A and the Fond du Lac County line, by milling and overlaying the asphalt pavement. Additionally, other project work includes: Reconstructing pedestrian curb ramps within the project limits to meet ADA standards.Replacing the existing guardrail at the bridge over the Puchyan River.Upgrading the traffic signal equipment at the intersection of WIS 23 and WIS 49/County to include a protected left turn only phase.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data