WIS 29 (Clark County Line to County E)
Sector: Bridge • Location: Rhinelander, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
WIS 29 pavement in the westbound lanes from WIS 13 Bridge to County E South is showing signs of deterioration. The existing concrete pavement has longitudinal cracking and joint deterioration. The westbound off ramp at Silver Maple Lane is in poor condition. The existing asphalt shoulders are nearly 30 years old and are in poor condition. Further, the guardrail along this stretch is in need of rep
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | WIS 29 pavement in the westbound lanes from WIS 13 Bridge to County E South is showing signs of deterioration. The existing concrete pavement has longitudinal cracking and joint deterioration. The westbound off ramp at Silver Maple Lane is in poor condition. The existing asphalt shoulders are nearly 30 years old and are in poor condition. Further, the guardrail along this stretch is in need of replacement to update to current standards. Pedestrian curb ramps at WIS 13 will be brought up to standards. Proposed Work includes: Patch deteriorated areas of concrete pavement along the westbound lanes for the project length.Replacing the westbound off ramp at Silver Maple Lane with concrete pavementReplacing the asphalt shouldersUpdate the guardrail within the project limitsEvaluate and update the curb ramps along WIS 13 at the westbound WIS 29 ramps This improvement concept will address the identified issues and extend the pavement service life. The eastbound lanes along this same section were addressed with a construction project in 2020. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
