logo

WIS 29 (South Highline Road to Brown County line)

Sector: Commercial • Location: Hartland, Angelica, Maple Grove, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

The existing concrete pavement on WIS 29 is showing signs of deterioration. To address this and other issues, proposed improvements include: Repairing or replacing the concrete pavement joints and cracks on WIS 29 and along the WIS 29 and WIS 55 interchange rampsRepairing versus replacing the joint/cracks will depend on the severity of joint deterioration.Resurfacing the asphalt shoulders on WIS 2

Project Information FAQ

Project Information

4 Q
The project “WIS 29 (South Highline Road to Brown County line)” is an infrastructure initiative in the Commercial sector, located in Hartland, Angelica, Maple Grove, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The existing concrete pavement on WIS 29 is showing signs of deterioration. To address this and other issues, proposed improvements include: Repairing or replacing the concrete pavement joints and cracks on WIS 29 and along the WIS 29 and WIS 55 interchange rampsRepairing versus replacing the joint/cracks will depend on the severity of joint deterioration.Resurfacing the asphalt shoulders on WIS 29 within the concrete joint repair sectionsReplacing asphalt shoulders to full depth on the WIS 29 and WIS 55 interchange rampsReplacing the concrete pavement to full depth along WIS 29 westbound from River Road to just east of Broadway Road and along WIS 29 eastbound from County F to Spruce RoadRepairing and cleaning five culvert pipes under WIS 29 along with cleaning and clearing brush from the ditchesReplacing guardrail systems along WIS 29 and WIS 55Resurfacing WIS 55 from County S to just east of the WIS 29 westbound entrance rampResurfacing the park and ride parking lot on Lot Lane west of WIS 29 and just south of County S

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data