WIS 46 Pavement Recycling and Asphalt Placement
Sector: Road • Location: Balsam Lake, Wisconsin, United States
Source: DrydenWire
Recycling 4 inches of pavement in place on the rural portion; placing 2.75 inches of new asphalt and installing centerline rumble strips; milling 3.25 inches of pavement in the village of Balsam Lake and placing 3.35 inches of new asphalt; cleaning, extending, lining or replacing culverts; replacing or adjusting guardrail; and replacing curb ramps in the village of Balsam Lake from US 8 to WIS 35.
- Status
- Under Construction
- Sector
- Road
- Location
- Balsam Lake, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- DrydenWire
ConstructChat
Ask ConstructChat about WIS 46 Pavement Recycling and Asphalt Placement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Recycling 4 inches of pavement in place on the rural portion; placing 2.75 inches of new asphalt and installing centerline rumble strips; milling 3.25 inches of pavement in the village of Balsam Lake and placing 3.35 inches of new asphalt; cleaning, extending, lining or replacing culverts; replacing or adjusting guardrail; and replacing curb ramps in the village of Balsam Lake from US 8 to WIS 35. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Balsam Lake |
Source
Source | DrydenWire |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
