logo

WIS 49 (South Street to South Washington Street)

Sector: Water Supply and Storage • Location: Berlin, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

The existing WIS 49 pavement is deteriorating with cracking and rutting throughout. The pavement has met the end of its useful service life. Proposed improvements include: Replace the existing concrete pavement with concrete pavement.An alternative of new asphalt pavement is viable and the city of Berlin will provide input on the preferred pavement alternative.Replace existing concrete curb and gu

Project Information FAQ

Project Information

4 Q
The project “WIS 49 (South Street to South Washington Street)” is an infrastructure initiative in the Water Supply and Storage sector, located in Berlin, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The existing WIS 49 pavement is deteriorating with cracking and rutting throughout. The pavement has met the end of its useful service life. Proposed improvements include: Replace the existing concrete pavement with concrete pavement.An alternative of new asphalt pavement is viable and the city of Berlin will provide input on the preferred pavement alternative.Replace existing concrete curb and gutter on WIS 49 from 100 feet south of South Street to the Washington Street and Broadway Street intersection.Review intersection alternatives at the WIS 49/Spring Street and Washington Street and Broadway Street intersections to address truck turning movement issues.Upgrade existing curb ramps along WIS 49 in the city of Berlin to meet current ADA standards where possible.Install new pavement marking, including high-visibility crosswalks at high pedestrian traffic crossings.Traffic signal improvements including removing the existing signals at North Pearl Street, adding signals or all-way stop control at North Wisconsin Street, and replacement of the existing signals at the WIS 49 and Spring Street intersection.Evaluate curb bump-outs (curb extensions) at the intersections determined by the city to reduce crosswalk widths and improve visibility.Replace and/or adjustment of existing storm sewer where necessary.Narrow of WIS 49 from the Fox River Bridge to Washington Street to reduce excess roadway width and improve visibility.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data