logo

WIS 54 (Maple Drive to I-39)

Sector: Cement • Location: Portage County, Wisconsin, United States of America

Source: Wisconsin Department of Transportation (WisDOT)

Project
Design

The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for a pavement replacement project on WIS 54 between Maple Drive and I-39 in Portage County. This section of WIS 54 is approximately 1.5 miles in length. The existing pavement structure consists of asphalt overlaid with concrete. This atypical kind of overlay, concrete over asphalt, has resulted in an increas

Project Information FAQ

Project Information

4 Q
The project “WIS 54 (Maple Drive to I-39)” is an infrastructure initiative in the Cement sector, located in Portage County, Wisconsin, United States of America. Taiyo aggregates data on it from Wisconsin Department of Transportation (WisDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for a pavement replacement project on WIS 54 between Maple Drive and I-39 in Portage County. This section of WIS 54 is approximately 1.5 miles in length. The existing pavement structure consists of asphalt overlaid with concrete. This atypical kind of overlay, concrete over asphalt, has resulted in an increased deterioration in the pavement, such as longitudinal and transverse cracking, spalling and shifting between slabs. The purpose of the project is to repair the deteriorating pavement. Proposed improvements include removing the concrete overlay on WIS 54, removing the asphalt underneath the concrete and adding 2 inches of base aggregate to the existing base layer. New asphalt will then be placed on top of the base layer. The roadway profile will be lowered by 2.75" through the pavement replacement. The project will also include replacement of select culverts, minor rehabilitation to a structure in the project limits, widening of the Hoover Avenue intersection, replacement of guardrail, pavement marking and centerline rumble strips.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data