WIS 54 (Maple Drive to I-39)
Sector: Cement • Location: Portage County, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for a pavement replacement project on WIS 54 between Maple Drive and I-39 in Portage County. This section of WIS 54 is approximately 1.5 miles in length. The existing pavement structure consists of asphalt overlaid with concrete. This atypical kind of overlay, concrete over asphalt, has resulted in an increas
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for a pavement replacement project on WIS 54 between Maple Drive and I-39 in Portage County. This section of WIS 54 is approximately 1.5 miles in length. The existing pavement structure consists of asphalt overlaid with concrete. This atypical kind of overlay, concrete over asphalt, has resulted in an increased deterioration in the pavement, such as longitudinal and transverse cracking, spalling and shifting between slabs. The purpose of the project is to repair the deteriorating pavement. Proposed improvements include removing the concrete overlay on WIS 54, removing the asphalt underneath the concrete and adding 2 inches of base aggregate to the existing base layer. New asphalt will then be placed on top of the base layer. The roadway profile will be lowered by 2.75" through the pavement replacement. The project will also include replacement of select culverts, minor rehabilitation to a structure in the project limits, widening of the Hoover Avenue intersection, replacement of guardrail, pavement marking and centerline rumble strips. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
