WIS 54 (New London to County S)
Sector: Water Supply and Storage • Location: New London, Wisconsin, United States of America
Source: Wisconsin Department of Transportation (WisDOT)
The WIS 54 pavement is showing signs of deterioration. The pavement was originally constructed in the mid 1990s. Needs identified along this section of WIS 54 include: Deteriorating pavement surface.The roadway has settled at the approaches to the Embarrass RiverStorm sewer inlets are deteriorating and in need of rehabilitation and pipe outfalls require cleaning.Existing sidewalk ramps do not meet
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The WIS 54 pavement is showing signs of deterioration. The pavement was originally constructed in the mid 1990s. Needs identified along this section of WIS 54 include: Deteriorating pavement surface.The roadway has settled at the approaches to the Embarrass RiverStorm sewer inlets are deteriorating and in need of rehabilitation and pipe outfalls require cleaning.Existing sidewalk ramps do not meet current ADA (Americans with Disabilities Act) standards.The existing traffic signal layout at the County D/North Shawano Street intersection is nearing the end of its service life.The proximity of the westbound WIS 54 lane drop to the County D/North Shawano Street intersection hascontributed to crashes. Proposed improvements include the following: Remove and replace the existing asphalt.Construct approach slabs and restore roadway profile at approaches to Embarrass River bridge.Replace all curb and gutter west of County D/North Shawano Street and spot locations east of County D/North Shawano Street.Repair various storm sewer inlets and clean outfalls and ditches.Installation of a new traffic signal at County D/North Shawano Street.Reconstruct sidewalk ramps at County D/North Shawano Street to meet current ADA standards. To address lane drop concerns, WIS 54 will be reconfigured to a two-lane configuration consisting of a 4-foot median shoulder, 12-foot lane, and 8-foot outside shoulder. The project is anticipated to be constructed with the US 45, Givens Road to Church Road project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
