Wisconsin Ave Milling & Resurfacing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - This project consists of milling and resurfacing Wisconsin Avenue from Vermont to Ridge, with the exception of the intersections of Plymouth, Sunset, and Ridge which will have the existing concrete pavement removed and replaced with a full-depth Hot-Mix Asphalt pavement. The full length of the existing curb and gutter will be replaced with B-4.12 Concrete Curb and Gutter. ADA Ramps and Det
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Manufacturing (Industrial), Commercial
- Location
- Berwyn, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wisconsin Ave Milling & Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - This project consists of milling and resurfacing Wisconsin Avenue from Vermont to Ridge, with the exception of the intersections of Plymouth, Sunset, and Ridge which will have the existing concrete pavement removed and replaced with a full-depth Hot-Mix Asphalt pavement. The full length of the existing curb and gutter will be replaced with B-4.12 Concrete Curb and Gutter. ADA Ramps and Detectable Warnings will be replaced as needed. Additionally, the project will consist of the instal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Berwyn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
