logo

Wise County Data Center Campus Power Supply

Sector: Natural Gas • Location: Wise, Virginia, United States

Source: Virginia Business

Project
Planned

Developers plan a $1 billion data center campus adjacent to the Lonesome Pine Airport in Wise County, aiming to generate about 600 megawatts of power on-site using hydrogen or natural gas. Red Post Energy Group is studying the feasibility of powering the project with hydrogen by building a $300 million facility to convert natural gas to hydrogen and a $700 million power station at the campus. If h

Project Information FAQ

Project Information

4 Q
The project “Wise County Data Center Campus Power Supply” is an infrastructure initiative in the Natural Gas sector, located in Wise, Virginia, United States. Taiyo aggregates data on it from Virginia Business.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Developers plan a $1 billion data center campus adjacent to the Lonesome Pine Airport in Wise County, aiming to generate about 600 megawatts of power on-site using hydrogen or natural gas. Red Post Energy Group is studying the feasibility of powering the project with hydrogen by building a $300 million facility to convert natural gas to hydrogen and a $700 million power station at the campus. If hydrogen is not practical, the project will be powered by natural gas. The campus could include 8 to 10 data center buildings on 300 acres under purchase option, with the first data center expected to open in three years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data