logo

Witch Hazel Road Pedestrian Improvement

Sector: Commercial • Location: Hillsboro, Oregon, United States of America

Source: Dodge USA

Project
Closed

Witch Hazel Road will be improved with a sidewalk from SE 38th Court to SE 49th Court. We will design and construct pedestrian improvements on Witch Hazel Road, from 38th Court to 49th Court along the south side of roadway including installation of supplemental lighting for pedestrians. This will complete a missing segment of sidewalk that will allow students an accessible route to adjacent school

Status
Closed
Sector
Commercial, Education, Car parking, Automotive, Road, Government
Location
Hillsboro, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Witch Hazel Road Pedestrian Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Witch Hazel Road Pedestrian Improvement” is an infrastructure initiative in the Commercial sector, located in Hillsboro, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Witch Hazel Road will be improved with a sidewalk from SE 38th Court to SE 49th Court. We will design and construct pedestrian improvements on Witch Hazel Road, from 38th Court to 49th Court along the south side of roadway including installation of supplemental lighting for pedestrians. This will complete a missing segment of sidewalk that will allow students an accessible route to adjacent schools and pedestrians a safe area to walk without walking in the roadway or on someone s property.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hillsboro

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Education, Car parking, Automotive, Road, Government

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project